logo

Witkop Solar Power Plant

Sector: Solar • Location: South Africa

Source: World Bank Group

Project
Active

The Witkop Solar Park, a 30 MW solar PV facility, was under development by the US-based solar company Sunedison. Sponsors of the project included Sunedison, backed by MEMC materials (51%) and an array of local South Africa businesses (49%). Shareholders in the holding company were CHINT / ASK & MEMC. Astroenergy Solar Korea (ASK) was a wholly owned subsidiary of CHINT Solar (Zheijiang), of CHINT

Status
Prospective
Sector
Solar, Car parking, Power Generation (CCGT), Power Transmission, Government, Automotive, Commercial
Location
South Africa
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Witkop Solar Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Witkop Solar Power Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Witkop Solar Park, a 30 MW solar PV facility, was under development by the US-based solar company Sunedison. Sponsors of the project included Sunedison, backed by MEMC materials (51%) and an array of local South Africa businesses (49%). Shareholders in the holding company were CHINT / ASK & MEMC. Astroenergy Solar Korea (ASK) was a wholly owned subsidiary of CHINT Solar (Zheijiang), of CHINT Groep. SunEdison was bought by MEMC in 2009. The project company was: Core Energy (Pty) Ltd. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012, but it was predicted that there would be a 20 year PPA with the state owned utility, Eskom. Construction was expected to start in December 2012. The project was to connect to the Witkop substation. EPC partner was Izingwe Capital. O&M partner was Landelahni investments. Management services provider was SunEdison Energy Southern Africa Total estimated project cost was ZAR 1.560 billion (USD 180 million), with commissioning expected for 2013. Financial closure was expected in June 2012. The power plant commenced its operation in April 2014. Coordinates were: 24° 2.5' S , 29° 21.7' . http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/3_%20Witkop%20Solar%20Park%208%20March%202012.pdf

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Car parking, Power Generation (CCGT), Power Transmission, Government, Automotive, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project