logo

Wixson Well No. 2 Construction

Sector: Water Supply and Storage • Location: Silverdale, Washington, United States of America

Source: Dodge

Project
Closed

Bids are being asked for provision of all necessary labor, equipment and materials required to construct a new well pump station with an on-site chlorine generation system and other appurtenances as described in the project specifications. The project is located in Silverdale, WA. The site is 8257 Dickey Road NW, Silverdale, WA 98383. The project lies within the SW 1/4 of Section 19, Township 25N,

Status
Closed
Sector
Water Supply and Storage, Cable car, Government, Waste Processing and Treatment, Road, Automotive, Commercial, Telecommunications
Location
Silverdale, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wixson Well No. 2 Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wixson Well No. 2 Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Silverdale, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Bids are being asked for provision of all necessary labor, equipment and materials required to construct a new well pump station with an on-site chlorine generation system and other appurtenances as described in the project specifications. The project is located in Silverdale, WA. The site is 8257 Dickey Road NW, Silverdale, WA 98383. The project lies within the SW 1/4 of Section 19, Township 25N, Range 1E, W.M., Kitsap County, WA. The prospective bidder shall be a licensed and bonded contrac...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Silverdale

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cable car, Government, Waste Processing and Treatment, Road, Automotive, Commercial, Telecommunications

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project