WMATA Orange and Blue Line Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Clark Construction
Metro Orange & Blue Line Rehabilitation covers 27 miles of track and 23 stations. The rehabilitation includes traction power, automatic train control, motor control centers, communications upgrades, track fasteners replacement, tunnel lighting replacement, tunnel ventilation, and fire standpipe rehabilitation.
- Status
- Closed
- Sector
- Consumer Products, Mass Transit, Power Generation (CCGT), Tunnel, Rail, Government, Commercial
- Location
- Washington, dc, United States of America
- Updated
- 22 Jul 2026
- Source
- Clark Construction
ConstructChat
Ask ConstructChat about WMATA Orange and Blue Line Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Metro Orange & Blue Line Rehabilitation covers 27 miles of track and 23 stations. The rehabilitation includes traction power, automatic train control, motor control centers, communications upgrades, track fasteners replacement, tunnel lighting replacement, tunnel ventilation, and fire standpipe rehabilitation. |
Procurement method |
Location
Country | United States of America (USA) |
City | Washington, dc |
Source
Source reliability | High |
Source | Clark Construction |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Mass Transit, Power Generation (CCGT), Tunnel, Rail, Government, Commercial |
Article published date | 2023-08-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
- Orange County Convention Center
