Wobben Mangue Seco III & V Wind Farms
Sector: Commercial • Location: Brazil
Source: World Bank Group
The partnership of the Brazilian state-owned company Petrobras (51%) and the company Wobben Windpower (49%), a subsidiary of the German group Enercon, was granted authorizations to build two wind power plants located in the state of Rio Grande do Norte, in the municipality of Guamare (52 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL in June 2010, and two
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Car parking, Wind, Raw Materials, Government, Manufacturing (Industrial), Automotive
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Wobben Mangue Seco III & V Wind Farms
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The partnership of the Brazilian state-owned company Petrobras (51%) and the company Wobben Windpower (49%), a subsidiary of the German group Enercon, was granted authorizations to build two wind power plants located in the state of Rio Grande do Norte, in the municipality of Guamare (52 MW in total capacity). The 35-year contracts were signed with the regulatory agency ANEEL in June 2010, and two special purpose companies were created to manage the projects: Eolica Mangue Seco 3 Geradora e Comercializadora de Energia S.A. and Eolica Mangue Seco 4 Geradora e Comercializadora de Energia S.A. These two power plants are part of the Mangue Seco Wind Park, which has additional units owned by Petrobras and Alubar (Mangue Seco 1) and by Petrobras and state-owned Eletrobras (Mangue Seco 2). The two subsidiaries committed to invest US$ 106 million (BRL 212 million) in the construction of the power plants. The entire park cost US$ 212 million (BRL 424 million). In April 2011, a US$ 52.8 million (BRL 84 million) loan was granted by the state-owned banks BNB and BNDES. In 2010, the sponsor began the construction of the plants and in August 2011 both units started operations. The power generated at the Mangue Seco Wind Park was set to be sold to the regulated market under 20-year power purchased agreements which were granted in a competitive bidding process in December 2009. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Car parking, Wind, Raw Materials, Government, Manufacturing (Industrial), Automotive |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
