W&OD Trail Lighting
Sector: Commercial • Location: Arlington, Virginia, United States of America
Source: Dodge USA
Final phase to illuminate the length of the trail through the town, from Van Buren to the connection with the Sugarland Run Trail, east of the Herndon Parkway bridge, totaling approximately 3,800 linear feet. Costs are estimated from Phase 2 (completed January 2019) at $137 per foot based on pole spacing every 100 feet, escalated to FY24 or $168 per linear foot. This section has not yet been desig
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Final phase to illuminate the length of the trail through the town, from Van Buren to the connection with the Sugarland Run Trail, east of the Herndon Parkway bridge, totaling approximately 3,800 linear feet. Costs are estimated from Phase 2 (completed January 2019) at $137 per foot based on pole spacing every 100 feet, escalated to FY24 or $168 per linear foot. This section has not yet been designed. This project requires an agreement with the Northern Virginia Regional Park Authority. The T... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
