Wolf Booster Station Replacement
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge
The Wolf Booster Station Replacement Project includes the following: 1. All mechanical and electrical facilities to operate and control two 25 HP canned submersible pumping units and a 4 station bypass line 2. 18 x 22 CMU building with timber truss and metal roof 3. 12 reservoir inlet/outlet piping with seismic controlled motor operated actuator and flexible expansion joint 4. Reservoir electrical
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Metal, Forest Products and Packaging, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Big Bear City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wolf Booster Station Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wolf Booster Station Replacement Project includes the following: 1. All mechanical and electrical facilities to operate and control two 25 HP canned submersible pumping units and a 4 station bypass line 2. 18 x 22 CMU building with timber truss and metal roof 3. 12 reservoir inlet/outlet piping with seismic controlled motor operated actuator and flexible expansion joint 4. Reservoir electrical facilities including instrumentation, and security alarms 5. Site grading and paving 6. Perimete... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Big Bear City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Forest Products and Packaging, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
