Wolf Carbon Solutions Mt. Simon Hub Pipeline
Sector: Chemical (Industrial) • Location: Cedar Rapids, Iowa, United States of America
Source: Dodge USA
Proposed construction of a 280 mile steel pipeline from central IL to Cedar Rapids of a carbon dioxide capture system capable of transporting 12 million tons of C02 per year. Planned to run across portions of Linn, Cedar, Scott, and Clinton Counties in Iowa, to Rock Island, Henry, Stark, Knox, Peoria, Tazewell, Logan, DeWitt, and Macon in Illinois, the project would capture CO2 on-site at ADM Ceda
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Delayed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Proposed construction of a 280 mile steel pipeline from central IL to Cedar Rapids of a carbon dioxide capture system capable of transporting 12 million tons of C02 per year. Planned to run across portions of Linn, Cedar, Scott, and Clinton Counties in Iowa, to Rock Island, Henry, Stark, Knox, Peoria, Tazewell, Logan, DeWitt, and Macon in Illinois, the project would capture CO2 on-site at ADM Cedar Rapids and Clinton ethanol plants and permanently store it underground in the Mr. Simon Sandsto... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- William Pond Chemical Toilet Replacement
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- Diet-Induced Changes in Inflammation as Determinants of Colon Cancer (R01)
