Wolf Creek GSU Transformer Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
PROJECT DESCRIPTION: The scope of the project is to replace ten (10) 13.8/161kV single phase Generator Step-up Unit (GSU) transformers at the Wolf Creek power plant. The single phase transformers will be replace with three (3) 3-phaser GSUs for the Wolf Creek Power Plant located in Jamestown, Kentucky in Russell County.
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Hydro
- Location
- Jamestown, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wolf Creek GSU Transformer Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROJECT DESCRIPTION: The scope of the project is to replace ten (10) 13.8/161kV single phase Generator Step-up Unit (GSU) transformers at the Wolf Creek power plant. The single phase transformers will be replace with three (3) 3-phaser GSUs for the Wolf Creek Power Plant located in Jamestown, Kentucky in Russell County. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Jamestown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Hydro |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
