Wolf Point Solid Waste Building REBID
Sector: Water Supply and Storage • Location: Wolf Point, Montana, United States of America
Source: Dodge USA
The project consists of the construction of one of the following two buildings: a commercial 40 x 48 x 18 building with 16 0 truss clearance, two overhead garage doors, and two man doors. Or a commercial 40 x 54 x 18 building with 16 truss clearance, three overhead garage doors and two man doors
- Status
- Closed
- Sector
- Water Supply and Storage, Biomass, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial
- Location
- Wolf Point, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Wolf Point Solid Waste Building REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of one of the following two buildings: a commercial 40 x 48 x 18 building with 16 0 truss clearance, two overhead garage doors, and two man doors. Or a commercial 40 x 54 x 18 building with 16 truss clearance, three overhead garage doors and two man doors |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Wolf Point |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Biomass, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
