Wolf Summit Energy project
The owner, status and timeline of this project. A free account opens every field.
Source: Transformers Magazine
The Wolf Summit Energy project is a 600 MW combined-cycle natural gas power generation facility planned in Harrison County, West Virginia. It aims to support rising electricity demand driven by AI, data centres, and industrial growth, supplying electricity to Old Dominion Electric Cooperative.
- Status
- Prospective
- Sector
- Natural Gas, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Transformers Magazine
ConstructChat
Ask ConstructChat about Wolf Summit Energy project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Wolf Summit Energy project is a 600 MW combined-cycle natural gas power generation facility planned in Harrison County, West Virginia. It aims to support rising electricity demand driven by AI, data centres, and industrial growth, supplying electricity to Old Dominion Electric Cooperative. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
Source
Source | Transformers Magazine |
URL |
More Details
Record type | Project |
Sector | Natural Gas, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-11-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Natural Gas projects in USA
- Please repair Unit Heater 3 ( Natural Gas )
- Golden Pass LNG Project
- Multi-Fuel Limestone Kiln with Built-In Direct Air Capture
- Wisconsin Cow Manure-to-Natural Gas Facility
- 3 Month Gas Main Installation Project in Newtown
- Project Baccara Data Center
- MasTec Energy Infrastructure Construction
- Algonquin Gas Transmission Pipeline Expansion
