logo

Wolf wind farm

Sector: Wind • Location: South Africa

Source: World Bank Group

Project
Active

The project involves the construction of the 84MW Wolf wind farm, located in the Eastern Cape Province of South Africa. The project was awarded in October 2021 under the fifth bidding window of South Africa’s Renewable Energy Independent Power Producers’ Programme (REIPPPP). The electricity produced by the wind farm will be sold to state-owned company Eskom through a 20-year PPA. The project was w

Project Information FAQ

Project Information

4 Q
The project “Wolf wind farm” is an infrastructure initiative in the Wind sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction of the 84MW Wolf wind farm, located in the Eastern Cape Province of South Africa. The project was awarded in October 2021 under the fifth bidding window of South Africa’s Renewable Energy Independent Power Producers’ Programme (REIPPPP). The electricity produced by the wind farm will be sold to state-owned company Eskom through a 20-year PPA. The project was won by a consortium led by Red Rocket South Africa that also includes AIIM through its IDEAS Fund (part of Old Mutual Life Assurance Company), H1 Holdings, Jade-Sky Energy, and the non-profit company Red Rocket Opportunity Trust. The total value of the project is approx. $124 million and project finance funding was provided jointly by the mandated lead arrangers, Absa and Standard Bank. Financial close was achieved on 24 February, 2023. The project is scheduled for commissioning in March 2024. Realfin https://g7energies.com/brandvalley-and-rietkloof-reaches-financial-close-24-02-2023/ https://www.esi-africa.com/renewable-energy/renewable-energy-from-ipps-slowly-reaching-sa-power-grid/# https://startupmag.co.za/2023/02/red-rocket-closes-on-onshore-wind-projects-worth-r12-billion/ https://www.ijglobal.com/articles/170721/red-rocket-led-team-puts-wind-farms-to-fc https://redrocket.energy/wp-content/uploads/2021/11/Media-Release_African-IPP-Red-Rocket-wins-3-projects-in-Round-5-of-REIPPPP.pdf https://www.afrik21.africa/en/south-africa-ppas-for-brandvalley-rietkloof-and-wolf-wind-farms/ https://redrocket.energy/wp-content/uploads/2022/11/MediaRelease_RedRocket_LegalClose_REIPPPP_Round5_Nov2022.pdf https://redrocket.energy/wp-content/uploads/2021/12/Electricity-generation-lic-Application-form-2021_Rietkloof-Clean-1.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data