logo

Wolfville Active Transportation Network

Sector: Water Supply and Storage • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
In Progress

The project is for the development of a core AT network throughout the town of Wolfville. It is comprised of All-Ages-and-Abilities (AAA) walking and cycling facilities. The addition of the 10km+ of network would provide residents and visitors with safe, comfortable, and convenient access via AT modes, to key destinations in town and will connect to the provincial Blue Route cycling network. Facil

Status
Under Construction
Sector
Water Supply and Storage, Car parking, Cement, Automotive, Road
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Wolfville Active Transportation Network

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Wolfville Active Transportation Network” is an infrastructure initiative in the Water Supply and Storage sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

in progress

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is for the development of a core AT network throughout the town of Wolfville. It is comprised of All-Ages-and-Abilities (AAA) walking and cycling facilities. The addition of the 10km+ of network would provide residents and visitors with safe, comfortable, and convenient access via AT modes, to key destinations in town and will connect to the provincial Blue Route cycling network. Facilities in the town core include: 6km+ of separated multi-use pathways (MUP) and protected bike lanes, 3km+ AT connector trails and shared streets, as well as improving crossings and connecting sidewalk segments. The Project Scope includes: 1. Main Street: Protected bike lanes 3,140m (east = 1,760, west = 1,380) long by 3m width / asphalt with concrete barriers and bollards/ installation of RRFB/expansion of existing infrastructure 2. Skyway - Pleasant: MUP 2,370m long by 3m wide/asphalt, off road /paving existing MUP 3. Harvest Moon Trail: MUP 470m long by 3.2m wide/asphalt/refurbishment of existing trail corridor 4. Connectors: a. Highland to Harvest Moon - section a) MUP 130m long by 3m wide / material TBD section b) 100m paint, signage / refurbishment b. East end gateway to Harvest Moon - MUP 90m long by 3.2m wide/asphalt/new build c. Oak Ave extension to Harvest Moon - MUP 80m long by 3.2m wide, asphalt or crusher, new build d. Reservoir connector - MUP 190m long by 3m wide, crusher dust, refurbishment. e. Highland Ave to Wolfville School - MUP 120m long by 3m+ wide, asphalt, paint, signage. 5. Shared Streets: The following segments of shared streets treatments which include: paint, signage and speed humps. a. Kent Ave: 890m b. Gaspereau Ave: 1200m c. Sherwood Drive: 870m d. Cherry Lane: Bike boulevard 280m 6. New Sidewalk: a. Victoria Ave: Sidewalk 190m long, 2m wide/concrete or asphalt, Refurbishment. b. Front St & Harbourside: 40m long 2m wide/concrete, new build.

Original sector

Active Transportation

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Car parking, Cement, Automotive, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project