logo

Women’s Centre in Rufisque / Hollmén Reuter Sandman Architects

Sector: Education • Location: Senegal

Source: ArchDaily

Project
Closed

The area's building stock was dense and low-lying, so the centre was designed to blend in with its surroundings. To avoid the isolated feel of other projects they had seen, a solid outer wall enclosed structures around an inner courtyard. The building's red colour, created using iron-oxide pigment, gave it a unique identity within the neighbourhood. Upon completion, it was namedKër Xonq– the Red H

Project Information FAQ

Project Information

3 Q
The project “Women’s Centre in Rufisque / Hollmén Reuter Sandman Architects” is an infrastructure initiative in the Education sector, located in Senegal. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The area's building stock was dense and low-lying, so the centre was designed to blend in with its surroundings. To avoid the isolated feel of other projects they had seen, a solid outer wall enclosed structures around an inner courtyard. The building's red colour, created using iron-oxide pigment, gave it a unique identity within the neighbourhood. Upon completion, it was namedKër Xonq– the Red House.Text description provided by the architects.In the spring of 1996, a group of students from the Department of Architecture at the Helsinki University of Technology travelled to Senegal to address a challenge through architectural means. Among them were Saija Hollmén, Jenni Reuter, and Helena Sandman, students at the time. They were introduced to the work of a local women's group, who suggested the idea of designing a centre for the women's associations in their neighbourhood. Initially, this was undertaken as a learning exercise.Upon returning home, the students felt it important not to let the women down and began fundraising to build the centre. This process took time, allowing the project to evolve and mature over several years. Meetings with the women's groups helped refine the design, although focusing on priorities was difficult at times, as some members were concerned with details such as kitchenware. The architects stressed that the priority was to first build the centre, within the constraints of their limited budget. It was agreed that the centre had to accommodate a range of different activities, so both the indoor and outdoor spaces needed to be adaptable for flexible use.After securing support from the Finnish Ministry of Foreign Affairs and obtaining a site donated by the city ofRufisque, the design was finalised. The project incorporated local and recycled materials, including cement donated by a local factory and glass bricks made from old bottles. The roof design featured an insulated layer to help maintain a cool interior, a novel but effective solution for the region.It was also important to involve other civic organisations from the start. The team faced questions like, "Why a women's centre and not a sports club or kindergarten?" By communicating early and avoiding administrative ties, they hoped to prevent the centre from being politicised or repurposed away from its intended use by the women's groups.Once the spatial needs were clarified, the design required a thorough understanding of the surrounding urban context. Using satellite maps and visiting local homes, the architects studied the area's traditional architecture, which often centred buildings around a courtyard. They aimed to build the centre in the style of a typicalRufisquehome, avoiding the impression of a public facility.The opening of the Red House was a joyous occasion, attended by hundreds. After years of dedication and collaboration, the centre was completed, teaching the architects invaluable lessons about their profession and the importance of community.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data