logo

Wonowon School Partial Replacement

Sector: Power Generation (CCGT) • Location: Peace River, British Columbia, Canada

Source: Dodge

Project
Closed

Description This project consists of a new, approximately 916 m2, school addition consisting of 5 classrooms, storage room, gender neutral washrooms, admin area and open media-tech area. Construction will be cast in place concrete, pre-cast concrete, structural steel, glulam beams, wood floor over crawlspace, steel stud and GWB, aluminum windows/doors, SBS membrane roofing, resilient flooring, doo

Status
Closed
Sector
Power Generation (CCGT), Commercial, Car parking, Automotive, Metal, Education, Steel, Cement, Manufacturing (Industrial)
Location
Peace River, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wonowon School Partial Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wonowon School Partial Replacement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Peace River, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Description This project consists of a new, approximately 916 m2, school addition consisting of 5 classrooms, storage room, gender neutral washrooms, admin area and open media-tech area. Construction will be cast in place concrete, pre-cast concrete, structural steel, glulam beams, wood floor over crawlspace, steel stud and GWB, aluminum windows/doors, SBS membrane roofing, resilient flooring, doors, frames and hardware, mechanical, electrical and landscaping including concrete sidewalks, ram...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Peace River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Car parking, Automotive, Metal, Education, Steel, Cement, Manufacturing (Industrial)

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project