logo

WOOD INDUSTRIES I

Sector: Manufacturing (Industrial) • Location: Myanmar

Source: World Bank Group

Project
Closed

The First Wood Industries Project will improve the efficiency and product quality of the teak processing industries in Burma through the reconstruction and modernization of two teak sawmills of about 105,000 hoppus (H) tons capacity, rehabilitation of two plywood and veneer mills and the existing furniture factory, expansion of flooring production, construction of a central workshop, strengthening

Project Information FAQ

Project Information

5 Q
The project “WOOD INDUSTRIES I” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Myanmar. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The First Wood Industries Project will improve the efficiency and product quality of the teak processing industries in Burma through the reconstruction and modernization of two teak sawmills of about 105,000 hoppus (H) tons capacity, rehabilitation of two plywood and veneer mills and the existing furniture factory, expansion of flooring production, construction of a central workshop, strengthening of log storage and handling, and provision of training and technical assistance. The project's incremental output would generate annual revenues of about US$17 million of which about 72 would be in foreign exchange. Additional direct employment of about 600 would be generated after mill construction. Environmental conditions and worker safety would be enhanced by the provision of better dust and waste material collection facilities in the reconstructed and rehabilitated mills and factories. The main project risk would be possible delays in civil works construction. However, appropriate arrangements have been made to ensure that the project would be within the implementation capacity of the agencies concerned.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data