logo
ProjectClosed

Wood Pile Bridge Install

One of 10,000+ projects Taiyo tracks in Saskatchewan.

Source: Dodge

Removal And Disposal Of One Wood Pile Bridge And Supply And Installation Of Three 1 800 Mm Corrugated Steel Pipe Culverts On Highway No. 962, Approximately 2 Km Northeast Of Its Junction With Bushell Road, Near Uranium City, For A Total Installation Length Of 57 M.

Status
Closed
Sector
Bridge, Steel, Government, Road, Nuclear, Commercial, Metal
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Wood Pile Bridge Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wood Pile Bridge Install” is an infrastructure initiative in the Bridge sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Removal And Disposal Of One Wood Pile Bridge And Supply And Installation Of Three 1 800 Mm Corrugated Steel Pipe Culverts On Highway No. 962, Approximately 2 Km Northeast Of Its Junction With Bushell Road, Near Uranium City, For A Total Installation Length Of 57 M.

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Steel, Government, Road, Nuclear, Commercial, Metal

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project