logo

WOOD RESIDUE TO ENERGY

Sector: Power Generation (CCGT) • Location: Bulgaria

Source: World Bank Group

Project
Closed

The Wood Residue to Energy Project in Bulgaria, aims at reducing greenhouse gas emissions generated at Svilosa, by substituting coal with residual wood as a fuel for power, and heat generation, and, through savings of methane emissions from residual wood waste, stockpiled at the plant. The first component involves the installation of a biomass boiler to burn wood residues, thus reducing the amount

Status
Closed
Sector
Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Commercial, Government
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about WOOD RESIDUE TO ENERGY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “WOOD RESIDUE TO ENERGY” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Wood Residue to Energy Project in Bulgaria, aims at reducing greenhouse gas emissions generated at Svilosa, by substituting coal with residual wood as a fuel for power, and heat generation, and, through savings of methane emissions from residual wood waste, stockpiled at the plant. The first component involves the installation of a biomass boiler to burn wood residues, thus reducing the amount of coal needed in the combined heat and power (CNP) plant, but providing the Svilosa facility with the same energy requirements. As a result, it will reduce the release of greenhouse gases, and local pollutants, while the utilization of biomass wastes will reduce the release of methane emissions, which would have been released if these wastes were to be disposed. The biomass boiler to be installed, will have a capacity of 13 MW, and two scenarios have been considered: a) realistic case which assumes double production capacity by 2005; or, b) worst case, which assumes no expansion. The second component - emission reduction monitoring and certification - will ensure the appropriate monitoring and evaluation criteria, emission reduction units calculation, and verification and certification, as contained in the monitoring plan.

Original sector

Energy and Extractives

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Manufacturing (Industrial), Biomass, Natural Gas, Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project