logo
ProjectClosed

Wood River Sewer Separation

Closed · Illinois · Last reported Mar 2024

Source: Dodge USA

Work to be completed consists of construction of storm sewers, detention basins, and related work. The work includes about approximately 20,900 lineal feet of 12 to 72 storm sewer, 710 lineal feet of 7'x6' and 7'x4' precast box sewer, 533 lineal feet of large diameter jack-and-bore, 240 stormwater structures, 24,000 cubic yards of detention pond excavation, and related work including water and san

Status
Closed
Sector
Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive
Location
Wood River, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wood River Sewer Separation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wood River Sewer Separation” is an infrastructure initiative in the Commercial sector, located in Wood River, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work to be completed consists of construction of storm sewers, detention basins, and related work. The work includes about approximately 20,900 lineal feet of 12 to 72 storm sewer, 710 lineal feet of 7'x6' and 7'x4' precast box sewer, 533 lineal feet of large diameter jack-and-bore, 240 stormwater structures, 24,000 cubic yards of detention pond excavation, and related work including water and sanitary adjustments, tree removal, demolition, concrete and asphalt paving, sidewalks, fencing, and...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Wood River

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project