Woodbury Road Water Improvements
Sector: Water Supply and Storage • Location: Garden Grove, California, United States of America
Source: Dodge
The project consists of constructing approximately 2,500 feet of new 10-inch and 600 feet of new 8-inch C-900 polyvinylchloride (PVC) water mains and the abandonment of existing undersized 6-inch diameter asbestos cement pipe (ACP) water mains in the City of Garden Grove. The construction will include the installation of fittings, gate valves, fire hydrants, water services and appurtenances, trenc
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Consumer Products, Commercial
- Location
- Garden Grove, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Woodbury Road Water Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of constructing approximately 2,500 feet of new 10-inch and 600 feet of new 8-inch C-900 polyvinylchloride (PVC) water mains and the abandonment of existing undersized 6-inch diameter asbestos cement pipe (ACP) water mains in the City of Garden Grove. The construction will include the installation of fittings, gate valves, fire hydrants, water services and appurtenances, trenching, shoring, backfilling, compaction, asphalt repair and replacement, street replacement, pipe ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Garden Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Consumer Products, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
