logo

Woodfibre LNG Project, British Columbia

Sector: Chemical (Industrial) • Location: Canada

Source: Hydrocarbon Technology

Project
Closed

The Woodfibre LNG Project is a liquefied natural gas (LNG) processing and export facility proposed to be developed by Woodfibre Natural Gas, a Pacific Oil & Gas Company. The facility will be located around 7km south-west of Squamish, British Columbia, Canada, near the north-western shoreline of Howe Sound. Construction of the plant is anticipated to start in 2016 and first gas is expected by 2018

Project Information FAQ

Project Information

4 Q
The project “Woodfibre LNG Project, British Columbia” is an infrastructure initiative in the Chemical (Industrial) sector, located in Canada. Taiyo aggregates data on it from Hydrocarbon Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Woodfibre LNG Project is a liquefied natural gas (LNG) processing and export facility proposed to be developed by Woodfibre Natural Gas, a Pacific Oil & Gas Company. The facility will be located around 7km south-west of Squamish, British Columbia, Canada, near the north-western shoreline of Howe Sound. Construction of the plant is anticipated to start in 2016 and first gas is expected by 2018. The facility will operate for 25 years and have an annual processing and exporting capacity between 1.5 million tonnes (Mt) to and 2.1Mt of LNG. The project is expected to create approximately 600 jobs during construction and 100 permanent jobs when operational. The National Energy Board (NEB) approved the LNG export license for the project in December 2013 for the application submitted in July 2013. The Canadian Environmental Assessment and the British Columbia Environmental Assessment were performed for the Woodfibre project by the Canadian Environmental Assessment Agency (CEAA) and the British Columbia Environmental Assessment (BCEA), respectively. Woodfibre Natural Gas signed a purchase sales agreement (PSA) with Western Forest Products (WFP) to acquire the site for the LNG processing and export facility in 2013. According to the agreement, WFP will clean the site and perform remediation activities in order to acquire a certificate of compliance (CoC) from the British Columbian ministry of environment. The site currently features an existing FortisBC gas pipeline, an electricity transmission line connected to the BC Hydro transmission grid and an existing deep-water port. Pacific Energy Corporation (PEC) is discussing with the Spectra Energy Transmission (Spectra) to use the latter’s existing pipeline systems for the transportation of the natural gas. Spectra is a joint venture of FortisBC Energy (FEVI) and Westcoast Energy (Westcoast). The project will be developed in a single phase. Two possible configurations are being considered for residing the gas pre-treatment and LNG processing facilities of the project. The preferred configuration is a permanently moored floating liquefied natural gas (FLNG) barge equipped with gas pre-treatment and LNG processing modules will be constructed near shore. The other configuration envisages the construction of all gas pre-treatment and LNG processing modules on land. The project will include development of a natural gas liquefaction facility and an LNG export facility. It will involve the construction and installation of a natural gas reception system, natural gas liquefaction train modules, gas pre-treatment modules, gas liquefaction train modules, power supply systems and marine terminals. The project is expected to annually use 40 LNG carriers, which will be equipped with advanced radar systems, leak detection and emergency shutdown technology. Other support infrastructure will include single marine mooring facilities, materials offloading facility and other temporary facilities such as electrical substations, site administration, and chemical-fuelling-storage facilities. A helipad will also be constructed. Other utility facilities will be drinking water, sewer and wastewater systems. The natural gas produced from the LNG facility will be exported via the FortisBC pipeline. The gas will be liquefied and loaded into LNG carriers for further transportation. The LNG will be stored in floating storage units (FSU). The feed gas will be supplied by the Eagle Mountain-Woodfibre gas pipeline. KBR was contracted to carry out the front-end engineering and design (FEED) services for the project, in March 2016. Guangzhou Gas entered into an off-take agreement with Woodfibre for 1mtpa of LNG for a period of 25 years starting from 2020. Linde Group is responsible for providing engineering and procurement services for the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data