Woodland Creek Community Park Bridge Replacement
Sector: Water Supply and Storage • Location: Olympia, Washington, United States of America
Source: Dodge
This contract covers replacing the pedestrian bridge over Woodland Creek in the south-central part of Woodland Creek Community Park. The work includes removing the existing bridge and bollards, building two abutments with wingwalls, assembling and installing a prefabricated bridge, stabilizing upstream banks, regrading and repaving at the bridge ends, relocating junction boxes, constructing new bo
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Automotive, Bridge, Government, Commercial
- Location
- Olympia, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Woodland Creek Community Park Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract covers replacing the pedestrian bridge over Woodland Creek in the south-central part of Woodland Creek Community Park. The work includes removing the existing bridge and bollards, building two abutments with wingwalls, assembling and installing a prefabricated bridge, stabilizing upstream banks, regrading and repaving at the bridge ends, relocating junction boxes, constructing new bollards, and other work above and around the ordinary high-water marks. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Olympia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Automotive, Bridge, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
