Woodland (PA) Walmart Distribution Center 6027-1004 RM
Sector: Warehouse • Location: Woodland, Pennsylvania, United States of America
Source: Dodge
Scope of work listed below is specifically for the Warehouse areas: warehouse area climate control interior rigid insulation building louvers and roof fan infill inspection windows between dock doors replace interior clerestory window film utility transformers replace warehouse exit doors
- Status
- Closed
- Sector
- Warehouse, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Woodland, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Woodland (PA) Walmart Distribution Center 6027-1004 RM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work listed below is specifically for the Warehouse areas: warehouse area climate control interior rigid insulation building louvers and roof fan infill inspection windows between dock doors replace interior clerestory window film utility transformers replace warehouse exit doors |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Woodland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Warehouse, Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- FILL IN 2 OPENINGS BTWN WAREHOUSE & STORAGE USES WITH ELECT & MECH MODIFICATIONS. FIRE SPKLR MODIFY.
- CONSTRUCTION OF A 49,090 SQ. FT. WAREHOUSE 439-0103-002-00 ON A CURRENTLY VACANT PARCEL.
- NEW 5,976-SQUARE-FOOT SPECULATIVE WAREHOUSE BUILDING WITH MEZZANINES ON A VACANT 0.25-ACRE LOT.
- NEW 93,515 SQ.FT. WAREHOUSE BUILDING.
- TI OF (E) WAREHOUSE SPACE TO PROVIDE QN OPEN OFFICE AREA AND RESTROOMS
- TI IMPROVEMENTS OF AN (E) WAREHOUSE,CREATING A CATERING KITCHEN FOR A GROUP THAT DELIVERS MEALS TO SCHOOLS.
- Hillsborough County Operations Complex
- National Museum of the United States Army
