logo

Woods Battery Electric Bus Charging Station Pilot Program

Sector: Cable car • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project

Woods Battery Electric Bus Charging Station Pilot Program Share this: Facebook Twitter LinkedIn Three Battery Electric Buses Enter Muni Revenue Service Powered by nine newly installed electric battery charging dispensers, the first of three battery electric buses have entered revenue service, bringing the agency closer to achieving its greater goal of an all-electric fleet and a carbon-neutral San

Project Information FAQ

Project Information

3 Q
The project “Woods Battery Electric Bus Charging Station Pilot Program” is an infrastructure initiative in the Cable car sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Woods Battery Electric Bus Charging Station Pilot Program Share this: Facebook Twitter LinkedIn Three Battery Electric Buses Enter Muni Revenue Service Powered by nine newly installed electric battery charging dispensers, the first of three battery electric buses have entered revenue service, bringing the agency closer to achieving its greater goal of an all-electric fleet and a carbon-neutral San Francisco by 2040, as explained in the SFMTA’s Sustainability and Climate Action Program . Project Introduction As part of the program, Muni had initially ordered nine battery-electric buses, three each from three manufacturers, New Flyer, BYD USA and Proterra, for an 18-month tryout. As the program evolved, a fourth manufacturer, Nova Bus, was added to the program who would bring in three additional e-buses for the extensive testing. Currently five e-buses have arrived. The rest of seven will be delivered by the end of 2022. To meet the demand to charge more buses, three more chargers were added to the system making it a total of 12. The three additional chargers are currently in fabrication and anticipated to be delivered in spring 2022.  The overall completion of the installation project is expected for summer 2022. In addition to the battery electric bus chargers, the updated infrastructure has also been constructed including electrical support equipment, which is enclosed within the Electrical Equipment Center directly adjacent to the charging stations. Project Timeline Spring 2019 - Fall 2019 Detail Design Pending Fall 2020 - Winter 2021 Construct Battery Chargers Pending Spring 2022 - Fall 2023 E-bus Testing and Evaluation Pending Improvements Bus Routes and Rail Lines 9 San Bruno 22 Fillmore 29 Sunset 44 O'Shaughnessy SFMTA - the Greenest Transit System in North America As of 2018, 45 percent of San Francisco’s greenhouse gas emissions are generated by the transportation sector which is heavily reliant on carbon intensive fossil fuels. Our reliance on harmful fossil fuels is changing earth’s climate and contributes to extreme weather events, increased forest fire risk and sea level rise. The SFMTA is a leader in providing safe and sustainable transportation options. The SFMTA’s energy-efficient Muni fleet contributes less than two percent of the sector’s emissions and moves approximately 700,000 every day! Today, the SFMTA operates the greenest transit system of any major city in North America Electric Bus Pilot Program Questions remain about whether battery electric buses can handle San Francisco’s heavy transit ridership and hilly routes. Before deploying battery electric buses, they must deliver the same reliability and service as our current hybrid-electric and trolley bus fleet . In recent years, battery electric bus technology has progressed significantly. To determine if this technology is ready for San Francisco, the SFMTA is implementing this 18-month battery electric bus pilot program. The three e-buses will be tested on some of our most hilly routes, serving the 9 San Bruno, 22 Fillmore, 29 Sunset and 44 O'Shaughnessy lines. The e-buses will be running on the same line each day to gather data on how they respond to the challenges of revenue service across our unique geographic terrain. After the evaluation period, the SFMTA will develop its future procurement strategy in conjunction with the SFMTA’s Zero Emission Bus Rollout Plan. Contact Information Jay Lu, Public Relations Officer jay.lu@sfmta.com 415.701.4387

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data