Woodsmith Project
Planned · Yorkshire · Last reported Sep 2025
Source: Yorkshire Post
The Woodsmith project involves the creation of a new mining site near Sneaton to the south of Whitby and a 23 mile tunnel that will transport a naturally occurring mineral, polyhalite, to new processing and shipping facilities on Teesside. The product will be sold as a fertiliser suitable for organic use to boost crop yields and aid sustainable farming. The project is planned to continue under the
- Status
- Prospective
- Sector
- Fertilizers, Tunnel, Raw Materials
- Location
- Whitby, Yorkshire, United Kingdom
- Updated
- 22 Jul 2026
- Source
- Yorkshire Post
ConstructChat
Ask ConstructChat about Woodsmith Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Woodsmith project involves the creation of a new mining site near Sneaton to the south of Whitby and a 23 mile tunnel that will transport a naturally occurring mineral, polyhalite, to new processing and shipping facilities on Teesside. The product will be sold as a fertiliser suitable for organic use to boost crop yields and aid sustainable farming. The project is planned to continue under the new Anglo Teck group following a merger between Anglo American and Teck Resources. |
Original sector | Mining |
Budget |
Location
Country | United Kingdom (UK) |
State | Yorkshire |
City | Whitby |
Source
Source | Yorkshire Post |
URL |
More Details
Record type | Project |
Sector | Fertilizers, Tunnel, Raw Materials |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
