Woodstock (GA) Walmart Supercenter 5275-1005 SP
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Existing perimeter walls at space to remain except temporary infill wall and door. Remove existing wall finishes and base at perimeter walls. Remove existing temporary infill wall and door. Remove existing ceiling tile and grid per plans. Add new ceiling tile and ceiling grid per plans. Existing light fixtures to be removed. Install new light fixtures. Add power and data. Clean existing hvac diffu
- Status
- Closed
- Sector
- Power Generation (CCGT), Tunnel, Mass Transit, Commercial, Manufacturing (Industrial)
- Location
- Woodstock, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Woodstock (GA) Walmart Supercenter 5275-1005 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Notice of Completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Existing perimeter walls at space to remain except temporary infill wall and door. Remove existing wall finishes and base at perimeter walls. Remove existing temporary infill wall and door. Remove existing ceiling tile and grid per plans. Add new ceiling tile and ceiling grid per plans. Existing light fixtures to be removed. Install new light fixtures. Add power and data. Clean existing hvac diffusers and grilles, relocate per plans. Paint interior wall finishes. Install subway tile and nrp w... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Woodstock |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel, Mass Transit, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
