Woodville Highway from SR 263 to Gaile Avenue
Sector: Cable car • Location: Tallahassee, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
The primary purpose of these projects is to increase the capacity of SR 363 (Woodville Highway) from SR 263 (US 319) Capital Circle Southeast to Gaile Avenue (Segment 4) by widening from 2 to 4 lanes and to improve traffic flow through the Four Points area from Gaile Avenue to Paul Russell Road with a loop configuration (Segment 5). These projects are needed in order to increase roadway capacity
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The primary purpose of these projects is to increase the capacity of SR 363 (Woodville Highway) from SR 263 (US 319) Capital Circle Southeast to Gaile Avenue (Segment 4) by widening from 2 to 4 lanes and to improve traffic flow through the Four Points area from Gaile Avenue to Paul Russell Road with a loop configuration (Segment 5). These projects are needed in order to increase roadway capacity for people and goods traveling on Woodville Highway between southern Leon and Wakulla counties, and the City of Tallahassee. Improvements also include buffered bike lanes, re-alignment of the St. Marks Trail, sidewalk construction, widening of Ross Road and Tram Road, the extension of Tram Road, and the construction of 5 stormwater ponds and a closed storm sewer system.Segment 4 (SR 263 to Gaile Avenue) was funded for right-of-way acquisition beginning fiscal year 2018. Segment 5 (Gaile Avenue to Paul Russell Road) was funded for right-of-way acquisition beginning fiscal year 2019. Neither segment is funded for construction in the current FDOT Five-Year Work Program. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
