Wote Decarb
Sector: Residential • Location: China
Source: International Finance Corporation (IFC)
Headquartered in Zhengzhou, China, Zhengzhou Wote Energy-efficiency Technology Co., Ltd () (“Wote” or the “Company”) is a privately owned enterprise providing integrated energy efficiency and waste treatment solutions to the traditional steel industry through i) slag recycling and utilization (SRU), and ii) waste heat to electricity (WHE) generation from blast furnace gas and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | hold |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Headquartered in Zhengzhou, China, Zhengzhou Wote Energy-efficiency Technology Co., Ltd (http://www.zzwote.com/) (“Wote” or the “Company”) is a privately owned enterprise providing integrated energy efficiency and waste treatment solutions to the traditional steel industry through i) slag recycling and utilization (SRU), and ii) waste heat to electricity (WHE) generation from blast furnace gas and converter gas.IFC proposes to support Wote with an RMB-denominated loan of up to US$60 million for financing the acquisition of a 70MW WHE generation facility (Baigong Phase 1) that has been operational since 2012 for the 25MW unit and 2018 for the 45MW unit respectively, and the construction of an 80MW facility (Baigong Phase 2) with trial operation expected to take place by June 2025 (the “project”). The project is located within an existing steel processing facility premise in an industrial area and 500m from the nearest community. The generated electricity will be consumed by the steel processing facility, hence transmission line will not be required. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
