WPCA Vernon Pump Station Upgrades
One of 10,000+ projects Taiyo tracks in Connecticut.
Source: Dodge USA
The Project includes the following Work: The Project consists of the upgrade of the Town of Ellington s Vernon Wastewater Pump Station at 100 Windsorville Rd, Vernon, CT. The pump station upgrade includes 215 LF of ductile iron force main piping with associated trench and pavement restoration, bypass pumping during construction. Replacement of 3 dry pit submersible pumps and associated process pip
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Steel, Commercial
- Location
- Vernon Rockville, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WPCA Vernon Pump Station Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The Project consists of the upgrade of the Town of Ellington s Vernon Wastewater Pump Station at 100 Windsorville Rd, Vernon, CT. The pump station upgrade includes 215 LF of ductile iron force main piping with associated trench and pavement restoration, bypass pumping during construction. Replacement of 3 dry pit submersible pumps and associated process piping, valves, piping supports. Upgrades to the HVAC, masonry re-pointing, roofing, wet well repair... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Vernon Rockville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Government, Steel, Commercial |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
