logo

WR Project on ANR System

Sector: Natural Gas • Location: Wisconsin, United States

Source: The Globe and Mail

Project
Completed

The WR project provides mainline capacity to multiple points of delivery on the ANR System in Wisconsin. It was placed in service in November 2025 with total project costs of approximately US$0.7 billion.

Status
Closed
Sector
Natural Gas
Location
Wisconsin, United States of America
Updated
22 Jul 2026
Source
The Globe and Mail

ConstructChat

Ask ConstructChat about WR Project on ANR System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WR Project on ANR System” is an infrastructure initiative in the Natural Gas sector, located in Wisconsin, United States. Taiyo aggregates data on it from The Globe and Mail.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The WR project provides mainline capacity to multiple points of delivery on the ANR System in Wisconsin. It was placed in service in November 2025 with total project costs of approximately US$0.7 billion.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

The Globe and Mail

URL

More Details

Record type

Project

Sector

Natural Gas

Article published date

2025-11-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project