WRF 1 Digester Equipment Rehabilitation Project IQC
Sector: Water Supply and Storage • Location: Corona, California, United States of America
Source: Dodge
The City of Corona Utilities Department seeks proposals from qualified design firms to prepare design and bid documents for the removal and replacement of existing sludge circulation pumps, heat exchangers, and related equipment. Additionally, firms will handle the Motor Control Center (MCC) design at Water Reclamation Facility (WRF) 1 for equipment related to three mesophilic anaerobic digesters,
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Rail
- Location
- Corona, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WRF 1 Digester Equipment Rehabilitation Project IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Corona Utilities Department seeks proposals from qualified design firms to prepare design and bid documents for the removal and replacement of existing sludge circulation pumps, heat exchangers, and related equipment. Additionally, firms will handle the Motor Control Center (MCC) design at Water Reclamation Facility (WRF) 1 for equipment related to three mesophilic anaerobic digesters, each with a capacity of 514,000 gallons (50 ft diameter, 30 ft height) The City of Corona Utilit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Corona |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT), Rail |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
