WRF Membrane Blower
Pre-design · Nevada · Last reported Jun 2024
Source: Dodge USA
Presently, the Water Reclamation Facility (WRF) operates two membrane blowers which provide air scouring for the membrane system. When the facility was built, it was anticipated that an additional blower would be necessary to accommodate membrane expansion. For this reason, a concrete pad, electrical cabinet, conduit and discharge piping were included in the project. The city has approved and is m
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Road, Government, Manufacturing (Industrial)
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WRF Membrane Blower
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Presently, the Water Reclamation Facility (WRF) operates two membrane blowers which provide air scouring for the membrane system. When the facility was built, it was anticipated that an additional blower would be necessary to accommodate membrane expansion. For this reason, a concrete pad, electrical cabinet, conduit and discharge piping were included in the project. The city has approved and is moving forward with the WRF membrane system replacement and expansion. Current air demands require... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Power Generation (CCGT), Waste Processing and Treatment, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
