WRF UV Disinfection Conversion
Sector: Waste Processing and Treatment • Location: Ormond Beach, Florida, United States of America
Source: Dodge USA
Installation of a new Ultraviolet (UV) system and associated electrical equipment within the existing chlorine contact chamber (CCC) at the City of Ormond Beach WRF. This project also consists of constructing a new electrical building for the UV systems PDC s, demolishing the existing chemical storage building, new effluent transfer pumps, and demolishing the front half of the CCC as shown in the
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Commercial, Power Generation (CCGT), Chemical (Industrial), Government, Manufacturing (Industrial), Water Supply and Storage
- Location
- Ormond Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WRF UV Disinfection Conversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of a new Ultraviolet (UV) system and associated electrical equipment within the existing chlorine contact chamber (CCC) at the City of Ormond Beach WRF. This project also consists of constructing a new electrical building for the UV systems PDC s, demolishing the existing chemical storage building, new effluent transfer pumps, and demolishing the front half of the CCC as shown in the plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Ormond Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Power Generation (CCGT), Chemical (Industrial), Government, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
