WRF Waste Activated Sludge Thickening Improvements
Sector: Road • Location: Des Moines, Iowa, United States of America
Source: Dodge USA
WRF Waste Activated Sludge Thickening Improvements, 042024010 The improvement includes sequenced demolition, replacement, and modifications of the existing waste activated sludge thickening system, polymer chemical system, electrical gear, controls, and associated components and other incidental items, all in accordance with the contract documents including Plan File No. 663-141/203, located at Bu
- Status
- Under Construction
- Sector
- Road, Waste Processing and Treatment, Chemical (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Des Moines, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WRF Waste Activated Sludge Thickening Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WRF Waste Activated Sludge Thickening Improvements, 042024010 The improvement includes sequenced demolition, replacement, and modifications of the existing waste activated sludge thickening system, polymer chemical system, electrical gear, controls, and associated components and other incidental items, all in accordance with the contract documents including Plan File No. 663-141/203, located at Buildings 70 and 75 at the Wastewater Reclamation Facility, 3000 Vandalia Road, Des Moines, Iowa. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Des Moines |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Chemical (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
