Wright - Nutrient Reduction Wetland Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
In general, the work involves, but is not limited to, selective clearing, excavation and grading, , riprap placement, and seeding. This project includes around 9,500 cubic yards of earthwork, 6,950 square yards of rolled erosion control mat, 1,100 linear feet of straw wattle placement, 143 tons of riprap along with 45 tons of macadam stone and 4.5 acres of seeding.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial
- Location
- Eagle Grove, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Wright - Nutrient Reduction Wetland Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work involves, but is not limited to, selective clearing, excavation and grading, , riprap placement, and seeding. This project includes around 9,500 cubic yards of earthwork, 6,950 square yards of rolled erosion control mat, 1,100 linear feet of straw wattle placement, 143 tons of riprap along with 45 tons of macadam stone and 4.5 acres of seeding. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Eagle Grove |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
