logo
ProjectBid Results

Wrightway Pump Station Improvements

Sector: Waste Processing and Treatment • Location: Dayton, Ohio, United States of America

Source: Dodge USA

This project consists of replacing two existing dry pit pumps with two submersible pumps, abandonment of the existing dry well, construction of a new valve vault, and piping from the new submersible pumps to the force main.

Status
Closed
Sector
Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
Location
Dayton, Ohio, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Wrightway Pump Station Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Wrightway Pump Station Improvements” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Dayton, Ohio, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of replacing two existing dry pit pumps with two submersible pumps, abandonment of the existing dry well, construction of a new valve vault, and piping from the new submersible pumps to the force main.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Dayton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Government, Commercial, Water Supply and Storage

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project