W/S III-NAIROBI EXTE
Sector: Water Supply and Storage • Location: Kenya
Source: World Bank Group
The Second Nairobi Water Supply Project will improve the existing water supply system and extend distribution to new areas resulting in a net increase of about 23 IMgd (104,500 m3/day) to the amount of treated water delivered to Nairobi on an average daily basis. Major components include treatment and transmission facilities, trunk mains, pumping stations, and distribution systems. The project als
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about W/S III-NAIROBI EXTE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Nairobi Water Supply Project will improve the existing water supply system and extend distribution to new areas resulting in a net increase of about 23 IMgd (104,500 m3/day) to the amount of treated water delivered to Nairobi on an average daily basis. Major components include treatment and transmission facilities, trunk mains, pumping stations, and distribution systems. The project also provides for training of staff of the Water and Sewerage Department (WSD) of NCC, technical assistance for improving the accounting and financial management system for water supply and sewerage operations, and consulting engineering services for detailed design and construction supervision. On completion in 1981, the project will serve a population of about 1,070,000 -- an increase of about 80 percent over the population currently served. There are no special risks, although slower growth in water demand could result in excess capacity and a reduced rate of return, and deterioration in WSD's staff position could have adverse effects on operations. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kenya
- Kenya Electricity Generating Company Olkaria II Expansion Nairobi
- Construction of Phase II Students’ Hostels at Bukura Agricultural College
- CONSTRUCTION OF EPZA WAREHOUSES
- MANUFACTURE OF TEXTILES IN THE EXPORT PROCESSING ZONES.
- Integrated Agricultural (Aquaponics) and Water project
- Kwale Sugar plantation
- Aggreko Embakasi and Eldoret Power Stations
- Malindi water utility contract
