WSLP-114 West Shore Lake Pontchartrain
Sector: Water Supply and Storage • Location: Saint Charles, Louisiana, United States of America
Source: Dodge
The work consists of clearing and grubbing; pump station and associated construction, drainage structure construction, floodwall construction (including braced floodwall and floodwall construction adjacent to and underneath an elevated highway); stop log construction, wingwall construction, placement of steel sheet piling, H-piling, pipe piles, precast/prestressed concrete piles, geotextile, geogr
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Rail, Waste Processing and Treatment, Cement, Metal, Steel, Mass Transit
- Location
- Saint Charles, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WSLP-114 West Shore Lake Pontchartrain
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of clearing and grubbing; pump station and associated construction, drainage structure construction, floodwall construction (including braced floodwall and floodwall construction adjacent to and underneath an elevated highway); stop log construction, wingwall construction, placement of steel sheet piling, H-piling, pipe piles, precast/prestressed concrete piles, geotextile, geogrid, grouted riprap; installation of metal ladders, stairs, cat walk, and railings; installation o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Saint Charles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Rail, Waste Processing and Treatment, Cement, Metal, Steel, Mass Transit |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
