logo

W/SUPPLY&SEWERAGE

Sector: Water Supply and Storage • Location: Eswatini

Source: World Bank Group

Project
Closed

The project provides for improving and extending water supply and sewerage facilities in Mbabane, Manzini and Nhlangano and consists of the following: (a) intake, pumping station and about 1-1/2 km of force main in Mbabane; (b) about 5 km of primary main in Manzini; (c) intake, treatment works, about 9 km of force main and two service reservoirs at Nhlangano; (d) about 40 km of small diameter dist

Project Information FAQ

Project Information

5 Q
The project “W/SUPPLY&SEWERAGE” is an infrastructure initiative in the Water Supply and Storage sector, located in Eswatini. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project provides for improving and extending water supply and sewerage facilities in Mbabane, Manzini and Nhlangano and consists of the following: (a) intake, pumping station and about 1-1/2 km of force main in Mbabane; (b) about 5 km of primary main in Manzini; (c) intake, treatment works, about 9 km of force main and two service reservoirs at Nhlangano; (d) about 40 km of small diameter distribution pipes in the three towns; (e) about 40 km of sewers in Mbabane and Manzini; (f) improvements to the Manzini sewage treatment works; (g) engineering services to prepare plans for construction of the project, provide assistance with bidding documents and supervise construction; accounting services to prepare a commercially-oriented financial and statistical information system and to train WSB staff; foreign technicians to train WSB technical personnel in operation and maintenance techniques; and postgraduate training abroad for three engineers and two accountants; and (h) two fully equipped maintenance trucks, a meter testing bench and small items of equipment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data