W/SUPPLY&SEWERAGE
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project provides for improving and extending water supply and sewerage facilities in Mbabane, Manzini and Nhlangano and consists of the following: (a) intake, pumping station and about 1-1/2 km of force main in Mbabane; (b) about 5 km of primary main in Manzini; (c) intake, treatment works, about 9 km of force main and two service reservoirs at Nhlangano; (d) about 40 km of small diameter dist
- Status
- Closed
- Sector
- Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Education
- Location
- Eswatini
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about W/SUPPLY&SEWERAGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project provides for improving and extending water supply and sewerage facilities in Mbabane, Manzini and Nhlangano and consists of the following: (a) intake, pumping station and about 1-1/2 km of force main in Mbabane; (b) about 5 km of primary main in Manzini; (c) intake, treatment works, about 9 km of force main and two service reservoirs at Nhlangano; (d) about 40 km of small diameter distribution pipes in the three towns; (e) about 40 km of sewers in Mbabane and Manzini; (f) improvements to the Manzini sewage treatment works; (g) engineering services to prepare plans for construction of the project, provide assistance with bidding documents and supervise construction; accounting services to prepare a commercially-oriented financial and statistical information system and to train WSB staff; foreign technicians to train WSB technical personnel in operation and maintenance techniques; and postgraduate training abroad for three engineers and two accountants; and (h) two fully equipped maintenance trucks, a meter testing bench and small items of equipment. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Eswatini |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Rail, Waste Processing and Treatment, Government, Education |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Eswatini
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Manzini Region Water Supply and Sanitation Project
- Lupohlo-Ezulwini Hydro Power
- Eswatini - Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study
