WTP 2 Flocculation Basin Structural Repair REBID
Sector: Water Supply and Storage • Location: Olmito, Texas, United States of America
Source: Dodge
) Structural repairs at Water Plant No.2 Rapid Mix Basin and Flocculation Basin as per Drawings and Contract Specifications. The southmost bridge at the Flocculation Basin is to be demolished and replaced in its entirety. There is shallow surface repair, deep surface repair, and crack injection repair that is required at the Rapid Mix Basin and Flocculation Basin. Many of these repairs are visible
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Bridge, Waste Processing and Treatment, Commercial
- Location
- Olmito, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WTP 2 Flocculation Basin Structural Repair REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ) Structural repairs at Water Plant No.2 Rapid Mix Basin and Flocculation Basin as per Drawings and Contract Specifications. The southmost bridge at the Flocculation Basin is to be demolished and replaced in its entirety. There is shallow surface repair, deep surface repair, and crack injection repair that is required at the Rapid Mix Basin and Flocculation Basin. Many of these repairs are visible and have been identified on the drawings, however, some are not visible. The Contractor is requi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Olmito |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Bridge, Waste Processing and Treatment, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
