WTP Automation and Control Upgrades Phase 1
Sector: Waste Processing and Treatment • Location: Spirit Lake, Iowa, United States of America
Source: Dodge USA
The Work for the said improvement, as required by the Contract Documents, is generally described as follows: Furnish all labor, materials, and equipment necessary to replace multiple turbidity, pH, chlorine analyzer sensors and transmitters, insert mag meters (multiple sizes), SCADA radios, improvements to the existing SCADA system, new SCADA server, and added monitoring of five (5) standby genera
- Status
- Closed
- Sector
- Waste Processing and Treatment, Advanced Electronics, Water Supply and Storage, Government, Commercial
- Location
- Spirit Lake, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WTP Automation and Control Upgrades Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work for the said improvement, as required by the Contract Documents, is generally described as follows: Furnish all labor, materials, and equipment necessary to replace multiple turbidity, pH, chlorine analyzer sensors and transmitters, insert mag meters (multiple sizes), SCADA radios, improvements to the existing SCADA system, new SCADA server, and added monitoring of five (5) standby generators, together with related subsidiary and incidental work in accordance with the plans and speci... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Spirit Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Advanced Electronics, Water Supply and Storage, Government, Commercial |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
