logo
ProjectClosed

WTP Boiler Replacement

Closed · Illinois · Last reported Mar 2024

Source: Dodge USA

Disconnect, remove and dispose of the existing Cleaver Brook boiler. Modify the existing concrete pad to accommodate the new boilers footprint. Provide, set, and assemble a new Weil McLain model-BG1894SF (or preapproved equal) steam boiler with power burner, gas train, water level controls, and pressure operating controls on the modified pad in the boiler room. Modify the existing natural gas pipi

Status
Closed
Sector
Natural Gas, Water Supply and Storage, Cement, Power Generation (CCGT), Rail, Government, Oil and Gas, Commercial, Manufacturing (Industrial)
Location
Moline, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WTP Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WTP Boiler Replacement” is an infrastructure initiative in the Natural Gas sector, located in Moline, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Disconnect, remove and dispose of the existing Cleaver Brook boiler. Modify the existing concrete pad to accommodate the new boilers footprint. Provide, set, and assemble a new Weil McLain model-BG1894SF (or preapproved equal) steam boiler with power burner, gas train, water level controls, and pressure operating controls on the modified pad in the boiler room. Modify the existing natural gas piping in the boiler room and connect it to the new boiler gas train. Modify the existing electrical ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Moline

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Natural Gas, Water Supply and Storage, Cement, Power Generation (CCGT), Rail, Government, Oil and Gas, Commercial, Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project