logo
ProjectBid Results, Design Development

WTP Controls Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

The Work can be briefly summarized as follows: Demolition the existing control system and interconnecting cables as indicated by the contract documents. Refer to all ID series drawings. Existing Controllers and IO Cards will be given to the District for safe keeping, all other components shall be disposed of or recycled by the Contractor. Supply, installation and connection of new control cabinets

Status
Closed
Sector
Telecommunications, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage
Location
Summerland, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WTP Controls Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WTP Controls Upgrades” is an infrastructure initiative in the Telecommunications sector, located in Summerland, British Columbia, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Bid Results, Design Development

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work can be briefly summarized as follows: Demolition the existing control system and interconnecting cables as indicated by the contract documents. Refer to all ID series drawings. Existing Controllers and IO Cards will be given to the District for safe keeping, all other components shall be disposed of or recycled by the Contractor. Supply, installation and connection of new control cabinets/ top hats for the following existing cabinets: Main PLC cabinet, renamed to JB3-001 Actiflo #1 r...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Summerland

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Telecommunications, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project