WTP Improvements Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work covered by the plans and specifications includes furnishing all labor, equipment, and the noted material for the replacement of the Citys two existing lime slakers and the installation of a carbonic acid feed system and CO2 storage tank. Engineering professional services for the Water Treatment Plant (WTP) High Rate Demonstration Study.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Wadsworth, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WTP Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work covered by the plans and specifications includes furnishing all labor, equipment, and the noted material for the replacement of the Citys two existing lime slakers and the installation of a carbonic acid feed system and CO2 storage tank. Engineering professional services for the Water Treatment Plant (WTP) High Rate Demonstration Study. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Wadsworth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
