WTP Meter Vault, Piping, and Associated Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Work includes installation of meter vault, piping, meters and all site improvements shown on the bid plans. The meter vault is not included in the bid, nor is installation of the 30 x 12 tapping sleeve and gate valve adjacent to 30 transmission pipe.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Norwich, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WTP Meter Vault, Piping, and Associated Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work includes installation of meter vault, piping, meters and all site improvements shown on the bid plans. The meter vault is not included in the bid, nor is installation of the 30 x 12 tapping sleeve and gate valve adjacent to 30 transmission pipe. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Norwich |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
