WTP to SR64 Water Main Pipe Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Replace 3.1 miles (16,368 LF) of 36" PCCP with 36" Ductile Iron Pipe (DIP). Sections of the new pipe must be installed and put into service before the similar stretch of old pipe can be removed from service. Old pipe is to be removed from the Right-of-Way (ROW) and not abandoned in place. Includes new services, hydrants, and valves as needed.
- Status
- Prospective
- Sector
- Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment
- Location
- Bradenton, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WTP to SR64 Water Main Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace 3.1 miles (16,368 LF) of 36" PCCP with 36" Ductile Iron Pipe (DIP). Sections of the new pipe must be installed and put into service before the similar stretch of old pipe can be removed from service. Old pipe is to be removed from the Right-of-Way (ROW) and not abandoned in place. Includes new services, hydrants, and valves as needed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Bradenton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Government, Steel, Commercial, Waste Processing and Treatment |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
