WTP2 Chemical Feed & Electrical Modifications
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
WTP2 Redundant Power improvements including installation of a new secondary utility feed to the plant and relocation of the existing WTP2 standby engine-generator. WTP2 Power Distribution improvements including installation of a complete medium voltage loop around WTP2 with step down transformers. Horizontal Collector Well Redundant Power improvements including installation of standby generators t
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Power Transmission, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Lenexa, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WTP2 Chemical Feed & Electrical Modifications
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WTP2 Redundant Power improvements including installation of a new secondary utility feed to the plant and relocation of the existing WTP2 standby engine-generator. WTP2 Power Distribution improvements including installation of a complete medium voltage loop around WTP2 with step down transformers. Horizontal Collector Well Redundant Power improvements including installation of standby generators to Horizontal Collector Wells 3 and 4, new automatic transfer switches (ATS) and an elevated concr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Lenexa |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Power Transmission, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
