WTR SUPPLY REHAB
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project would assist EMPAGUA in becoming a more efficient organization, capable of providing good service without recourse to operating subsidies from the Government. In order to accomplish this, the project comprises several components. They include (a) technical asistance for operational development and sector studies; (b) training for all levels of staff; (c) operational improvements cons
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Automotive, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial
- Location
- Guatemala
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WTR SUPPLY REHAB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would assist EMPAGUA in becoming a more efficient organization, capable of providing good service without recourse to operating subsidies from the Government. In order to accomplish this, the project comprises several components. They include (a) technical asistance for operational development and sector studies; (b) training for all levels of staff; (c) operational improvements consisting of equipment, vehicles, replacement of house connections and distribution mains, installation of water meters, construction of a meter repair shop, and purchase of imported chemicals and spare parts. Lastly, the project involves (d) construction of additional capacity for the production of water. Within the project, the technical assistance and training components would be implemented in association with a mentor water utility in another country. |
Original sector | Water, Sanitation and Waste Management |
Location
Country | Guatemala |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Automotive, Waste Processing and Treatment, Power Generation (CCGT), Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
