Wuhan Wastewater Treatment
Sector: Water Supply and Storage • Location: China
Source: Asian Development Bank (ADB)
To achieve sustainable wastewater management and protection of water resources, the overall objective of the wastewater collection and treatment project (WCTP) is to increase wastewater treatment capacity in Wuhan from the current 8 percent (32 percent after completion of an ongoing World Bank project) to approximately 64 percent of generated wastewater. Achievement of this objective will be key t
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Commercial, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Wuhan Wastewater Treatment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To achieve sustainable wastewater management and protection of water resources, the overall objective of the wastewater collection and treatment project (WCTP) is to increase wastewater treatment capacity in Wuhan from the current 8 percent (32 percent after completion of an ongoing World Bank project) to approximately 64 percent of generated wastewater. Achievement of this objective will be key to achievement of the related objectives of the WCTP to (i) improve water quality of rivers and lakes in Wuhan; (ii) protect drinking water resources; (iii) improve wastewater treatment and management; (iv) improve health and living standards of residents in Wuhan, to protect water resources; and (v) benefit the Changjiang. The proposed WCTP will include three wastewater treatment plants and associated sewers. The TA will identify institutional capacity building measures including wastewater management and policy reforms necessary to ensure the long-term sustainability of the WCTP facilities.The proposed WCTP comprises three advanced secondary wastewater treatment facilities and associated sewers. The TA will (i) assess the prefeasibility studies and environmental assessment WMG has prepared for the three subprojects, and (ii) undertake the additional analysis necessary to determine if the subproject are suitable for ADB financing. The TA will (i) review the present integrated environmental management status and strategies; (ii) evaluate the three subprojects in the context of long-term plans and strategies for wastewater management; (iii) review and confirm the technical, economic, financial, environmental, and social feasibility of options proposed under the domestic prefeasibility studies; (iv) define the scope and components of the proposed Project; (v) undertake alternative analysis and least-cost analysis for the proposed components; (vi) prepare (a) cost estimates for the project components, implementation arrangements, and associated staffing schedules; (b) counterpart contributions; (c) establishment and staffing of project implementation office; and (d) a financing plan; (vii) evaluate local counterpart fund sources, evaluate wastewater tariff levels, and through tariff reform promote the principle of users paying for investment and operation; (viii) prepare procurement packages for equipment, materials, and civil works, following standard ADB procedures; (ix) review and update the resettlement plan in line with the ADB guidelines; (x) review and update the environmental impact assessment and prepare a summary environmental impact assessment (EIA) for the proposed Project and, for each subproject, prepare a summary EIA or initial environmental examination following the ADB guidelines; (xi) carry out financial and economic analyses of the proposed WCTP and subprojects; (xii) estimate wastewater treatment charges that are affordable, encourage water savings, and allow sufficient cost recovery; (xiii) evaluate the potential impact on the urban poor, propose poverty reduction options to demonstrate that urban poor families will benefit from the proposed WCTP and from increased tariff; (xiv) propose management enterprise reform options; (xv) evaluate institutional requirements for implementing and operating the proposed WCTP facilities on a sustainable basis; and (xvi) evaluate opportunities for private sector participation in wastewater management for Wuhan. |
Original sector | Water and other urban infrastructure and services |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Government |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong