Wujiang Food Waste PPP Project
Project in planning · Hong Kong SAR, China
Source: InfraPPPWorld
To be located in Jiangsu Province, the scope of the project involves the Wujiang Food Waste Plant, which will be constructed on a build-operate-transfer model. The project is designed to have a daily food waste processing capacity of 200 tonnes, with a concession period of 25 years (construction period inclusive).
- Status
- Prospective
- Sector
- Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Hong Kong
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Wujiang Food Waste PPP Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | To be located in Jiangsu Province, the scope of the project involves the Wujiang Food Waste Plant, which will be constructed on a build-operate-transfer model. The project is designed to have a daily food waste processing capacity of 200 tonnes, with a concession period of 25 years (construction period inclusive). |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | Hong Kong |
Source
Source reliability | Low |
Source | InfraPPPWorld |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2023-03-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
