logo

Wuwei District Heating

Sector: Chemical (Industrial) • Location: China

Source: KFW Bank aus Verantwortung

Project
Completed

A comprehensive district heating system for 235,000 people is to be built in the metropolitan area of Wuwei City, the third largest city in Gansu Province. The proposed subsidy loan will be used to expand the existing system and supply three districts of the city (around 14,000,000 m2) with district heating. As part of the project, a heating plant with an output of 5 x 91 MW, 89 heat exchanger sta

Project Information FAQ

Project Information

5 Q
The project “Wuwei District Heating” is an infrastructure initiative in the Chemical (Industrial) sector, located in China. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A comprehensive district heating system for 235,000 people is to be built in the metropolitan area of Wuwei City, the third largest city in Gansu Province. The proposed subsidy loan will be used to expand the existing system and supply three districts of the city (around 14,000,000 m2) with district heating. As part of the project, a heating plant with an output of 5 x 91 MW, 89 heat exchanger stations, 2 pumping stations and 2 x 44.8 km of district heating pipes will be built. The new district heating supply will replace 155 inefficient decentralized boiler systems in a densely populated area and will also supply a newly developed residential area with heating. The new district heating system will be connected to two systems operated by the project sponsor. In addition, the project planning provides for the waste heat from a new state-owned power plant to be fed into the district heating system using combined heat and power. This further increases the impact of the project in significantly reducing emissions of nitrogen oxides, sulphur oxides, dust and carbon dioxide. The overall concept enables greater security of supply, so that the entire heating requirement for the 6-month heating period can be optimally covered. The total investment volume of the project amounts to around EUR 100 million, of which EUR 67 million is to be financed with a subsidised loan. Almost 80% of the FöK is earmarked for equipment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data